22 Oct
-1140x400w.jpg)
-1140x400w.jpg)
Installation in which the pipe path between the indoor and outdoor unit of the air conditioner is not longer than 3 meters.
- No need to dismantle the glazing or window.
- No need to use lifting equipment (aerial platform, crane, etc.)
- Does not include digging pipes and cables in the shade, floor or ceiling.
There is a suitable power supply near the outdoor or indoor unit of the air conditioner.
Leave a Comment